Formula

cementBags = volumeCum * cementPerCum; steelKg = volumeCum * steelKgPerCum; sandCft = volumeCum * sandCftPerCum

How the calculation works

Enter the total volume of concrete you will pour in cubic metres, which is the slab area multiplied by its thickness.

Enter the cement bags, steel kilograms and sand cubic feet that one cubic metre needs for your chosen mix and design.

The tool multiplies each per-cubic-metre rate by the volume to give the cement bags, steel weight and sand quantity.

Common mistakes

When to use it

Worked example

For 10 cubic metres of concrete with 8 bags of cement, 100 kg of steel and 15 cubic feet of sand per cubic metre, you need about 80 bags of cement, 1000 kg of steel and 150 cubic feet of sand.

Cement bags 80
Steel (kg) 1,000.00
Sand (cft) 150.00

Common questions

Are these figures exact?

No, they are thumb-rule estimates based on the rates you enter, and a structural engineer should confirm the real quantities for load-bearing work.